MakerWorld
Other Hobby & DIY
Trackside Oil loading
by rl4sound
88
Downloads
42
Likes
29
Makes
This is a trackside loading for Oil field and refinery. Assembly Instructions1. Put nozzles on the points of the tubes2. Glue the top plate to the tubes3. Put the legs in the Jig stand4. Glue 3 7mm rods on the legs5. Glue the tube assemby to the top of the rods6. Put walkway on the legsthen glue it
Sign in to leave a comment
Sign in